Find Nonprofit and Small Business Grants

Advance Search

Only Available for Paid Subscribers
Clear Filters
Search Filters

Parking Lot Solar PV Canopy with EV Charger Grant Program

Grants to Maryland Nonprofits, For-Profits, and Agencies
to Install Solar-Powered Electric Vehicle Chargers

Agency Type:

State

Funding Source:

Add to My Calendar 

Maryland Energy Administration (MEA)

Deadline Date:

09/07/18

Description:

Request a Grant Writer

Grants to Maryland nonprofits, for-profits, and government agencies to install solar-powered electric vehicle charging stations in parking lots and garages. The goal of this program is to increase the availability of electric vehicle stations that are powered by green energy.

In order to drive down the initial costs associated with installing solar PV canopy systems, MEA will award grants to qualified applicants on a competitive basis, within two specified Areas of Interest (AOI):

-AOI I: Businesses and nonprofits
-AOI II: State agencies and local governments

To be considered for an award, a proposed project shall meet the following qualifications:
-Consist of at least 75 kW of solar PV panels mounted on a canopy structure over a parking lot. (AOI I and II)
-Consist of at least four (4) new qualified Level II or Level III EV charging stations located in the same parking lot or on the same parking structure as the solar canopy. (The requirement for the location of the chargers may be waived by MEA.) (AOI I and II)
-The applicant must be able to exhibit control of the proposed project site, either as proof that the parking lot is owned or leased (with at least 25 years remaining after the expected completion of the project) by the applicant. (AOI I and II)
-The applicant must be able to exhibit a signed contract with an installing contractor/developer (AOI I or II). However, for state or local government agencies that must use a Request For Proposal, provide a letter of commitment, signed by a senior official from the agency documenting the agency’s commitment to the project. (AOI II only)
-The proposed project site shall have a minimum load of 150,000 kWh/year attributed to an on-site State or local government agency electric meter. (AOI II only)
-If a Power Purchase Agreement is being considered, the letter should also include the results of modeling or other actions taken by the government/agency to confirm that an acceptable economic solution is available on the open market. (AOIII only)

Application Evaluation Criteria:

MEA will assess qualifying applications for award based on the following competitive evaluation criteria:
-The total project cost per watt installed in the solar PV canopy system. (AOI I only);
-The number of qualified EV chargers to be installed (AOI I and II);
-Inclusion of an innovative project design and/or use (AOI I and II);
-The geographic diversity of grants awarded (AOI I and II);
-Additional roof or ground mounted capacity installed in conjunction with a canopy system. Please note, however, that MEA will not include roof or ground mounted capacity when determining the grant amount. (AOI I and II)
-Estimated visibility of the proposed carport and EV chargers to the general public. (AOI I and II);
-Estimated accessibility and frequency of use of the proposed carport and the EV chargers; (AOI I and II); and
-The frequency of parking lot use (AOI I and II).

Qualifying applicants that show innovative design/use, install more EV chargers, reduce the cost/watt, or include an innovative element to the project will be looked upon more favorably during the award process. MEA also reserves the right to select applications that allow for a broad diversity in the project portfolio including, but not limited to, geographical diversity.

Additional Project Requirements:

For a grantee to be reimbursed under the Grant Program, the project shall:
-Install at least 75 kW of solar PV panels mounted on a canopy structure over a parking lot.
-Install at least four (4) new qualified Level II or Level III EV charging stations which are located in the same parking lot or on the same parking structure as the solar canopy and that are:
-Certified by a Nationally Recognized Testing Laboratory (NRTL).
-Equipped with a Society of Automotive Engineers (SAE) J1772 electrical connector for Level II stations, or a DC Fast Charger with a SAE Combo and/or a CHAdeMO standard connector.
-Be installed on a parking lot in Maryland which is accessible for use at least five days a week.
-Be installed and operated in compliance with the requirements of local and county codes, as well as with applicable requirements of the National Electrical Code (NEC).
-Use PV system hardware that is in compliance with all applicable performance and safety standards including: Underwriters Laboratories Standard for Static Inverters and Charge Controllers for Use in Photovoltaic Systems (UL 1741) and Standard for Safety: Flat-Plate Photovoltaic Modules and Panel (UL 1703).
-Be installed in a manner that is compliant with the net metering regulations outlined in the Code of Maryland Regulations (COMAR) 20.50.10 et seq., as well as the requirements of the local electric utility and Authority Having Jurisdiction.

NABCEP: PV systems must be installed by an installation contractor who employs at least one staff member with a current North American Board of Certified Energy Practitioners (NABCEP) S o l a r Installation Certification; or, if the installation contractor employs at least 50 employees, at least one staff member with a NABCEP Installation Certification for every 25 non-administrative employees, unless the installation contractor has not been registered to do business in Maryland for 12 months prior to the submission of the grant application.

GrantWatch ID#:

GrantWatch ID#: 176657

Estimated Total Program Funding:

$2,000,000

Estimated Size of Grant:

MEA will provide up to $400 per kW (DC) of canopy mounted solar PV per project, with a maximum cap of $200,000 per project.

Term of Contract:

To receive grant funding for a project, the successful applicant must enter into a Grant Agreement with MEA by January 3, 2019 unless an extension is given in writing by MEA.

The following steps must be completed by each grantee by November 8, 2019
-Each project selected for award in Fiscal Year 2019 must be completed and in operation; and,
-Each Grantee must submit a complete Parking Lot Solar PV Canopy with EV Charger Grant Completion Package consisting of: A Completion Certificate; proof that the project is paid in full; copies of all inspection documents, permits, and licenses that are required to operate the project; project as-built drawings showing final capacity of PV array(s); a copy of the interconnection utility’s Acceptance and Final Approval to Operate; and a photograph of the installed and operational project.

Additional Eligibility Criteria:

Businesses, state and local government agencies, and nonprofits are eligible.

Pre-Application Information:

Timeline:
-Notice of Grant Availability Posted - Thursday, June 21, 2018
-Grant Application Deadline - Friday, September 7, 2018
-Grant Award Announcements - Thursday, October 9, 2018
-Grant Agreement Execution Deadline - Thursday, January 3, 2019
-Construction and Commissioning Deadline - Friday, November 8, 2019
-Final Inspection and Document Submission Deadline - Friday, December 6, 2019

Contact Information:

Before starting your grant application, please review the funding source's website listed below for updates/changes/addendums/conferences/LOIs.

For more questions, additional information or assistance, please contact:

David Comis
(410) 537-4064
David.Comis@Maryland.gov

URL for Full Text (RFP):

Geographic Focus:

USA: Maryland